Task: plans and revisions
Compare a current plan with a revision.
Use the fictional Aurora Page example in a test project. For assistant requests, write in the indicated lead or worker chat. Perform the remaining steps in the panel.
Steps
Open Plans and select the deliverable’s plan by title.
Read its content and revision indicator. Open history and select an older revision when available.
Check the change and return to the current plan before executing the next steps.
Save a copy plan with drafting, requirements checking and lead review steps.Check the result
The selected plan and revision are identifiable. If no plan exists, ask the assistant to save one before working.
If the record is missing, clear the section’s filters, check active or archived registration where that control exists, and confirm the correct team, board or task. A connection failure appears as an error and requires a retry.
Open the example screen
Copy the record address from your own panel. Preserve its slug and change only the tab parameters as shown below. The example path describes navigation and needs your actual record.
/app/tasks/<slug>?tab=plansPaste the address copied from the open task. The link below changes only the tab and preserves your service address.
Continue with the next chapter or consult the index. Usage guide index